Swelect Energy Systems resumes operations at Bengaluru plant

Swelect Energy Systems Ltd has announced that it has resumed operations at Solar Photovoltaic Modules Manufacturing Plant located in Bengaluru with effect from April 25.

Due to lockdown to combat COVID 19 the company had to keep its operations shut at its plants located in Bengaluru and Salem from March 24.

Swelect Energy Systems in a regulatory filing said “In order to execute an energy supply project to Airport Authority of India, we had requested the DIC office for granting us permission to run our facility with a skeletal strength as per MHA (Home Ministry) guidelines.”

As per the directions issued by the Joint Director, Department of Industries Centre (DIC), Bengaluru, the company has been permitted to resume its operation after following the guidelines issued by the central government during the COVID-19 pandemic, it said.

Accordingly, the company’s plant located at Bengaluru Rural District has resumed operations with effect from April